It s not a small job and it s all labor.
Replace carpet on stairs with hardwood.
You have to disassemble pretty much the whole rail install the hardwood cut all the posts and spindles and reattach.
If the spindles and posts go into carpet on each stair tread that adds a lot of money.
The carpet was old and dirty giving the entry a very dark and dated feel.
If you prefer you can round over a piece of wood.
In this video we re using a tread that already has a rounded front.
Go to our original installing plank on stairs.
The previous owner had installed tile near the doorway entry bottom of the stairs and 3 4 thick hardwood in the passageway at the top of the stairs.
Easy to follow video instruction tutorial.
Visit the chapters below go to matching floors stair treads.
How to replace stair carpet with paint one of the most dramatic remodeling changes you can make is to rip up all the dusty old carpeting in a house and replace it with hardwood.
My husband and i recently tore the carpet from our stairs and painted the wood underneath creating a fresh clean and modern look.
Designed to stairs existing pine stair has contracted the hardwood on landing tread you want a level on landing tread at least other person place.
How to renovate carpeted stairs to hardwood a budget stair remodel.
The other option is to replace the tread piece entirely with a hardwood border.
Attach that piece with construction adhesive and nails as well.
Replace carpet on stairs with hardwood.
To hardwood on the stairs safe could stop anyone have carpeted.
This web page originated in 2004 as a how to install plank flooring on stairs.
Installation and materials can range as low as 1 000 and as high as 30 000 price depends on several factors.
Hardwood stairs average 100 to 200 per step including labor a flight of stairs is 10 to 12 steps and would cost 1 000 to 2 400.
This is our stairs before.
Image of carpet on stairs and hardwood on landing possible on the edge of recent projects.
If you re going to do that measure the tread size cut the tread and then attach it.
We did this project over a full weekend and two additional weeks nights following.
As a result after removing the carpet the bottom step had a 7 rise and the top step had a 8 5 rise.
I haven t done my stairs yet for this reason.
Our main goal was to rip off the carpet see what wood was underneath and.